Banner-blog--top-shape
RRVA-Photo-2
chevron-green

Massive Engineering of the Red River Valley Alliance Diversion Project Explained through This Video From Diversion Authority

ByDevelop Develop /

Diversion Authority Explains How FM Diversion Will Work In New Video

FARGO, N.D.  — Metro Flood Diversion Authority has put out a new video to explain the massive engineering work being done to create the FM Area Flood Diversion.

 

It will provide permanent flood protection to around 235,000 people when it’s finished in 2027.

 

Greg Thompson with Houston Engineering narrates the video and explains how the different components will work together to divert floodwater around the metro to prevent catastrophic flooding.

 

VIDEO:

Source: KVRR

blog-bottom-shape
chevron-up

MORE NEWS

I-29 Short-Term Closure Planned
Contact Tara Ekren, PIO Red River Valley Alliance 701-306-3294 (cell)  |  pio@rrvafm.com    FARGO, N.D. – A short-term closure of...
Public Input Now Open
Construction to bring permanent, reliable flood protection to nearly 260,000 people in our area will impact Interstate 94 in West...
I-29 Short-Term Closure Planned
Contact Tara Ekren, PIO Red River Valley Alliance 701-306-3294 (cell)  |  pio@rrvafm.com    FARGO, N.D. – A short-term closure of...
Scroll to Top